The electricians were back on days 85 and 86 installing pot lights, outlets, and switches. My kitchen/dining room area looks like a landing strip.
All of these lights are on dimmer switches. They're nothing like the giant button style dimmers I'm used to; these are tiny nubs next to the switch.
The garage is well lit, too! I'm so excited to be able to have a year round work space.
My bedroom ceiling fan and the center mount light for the media room were also installed, as well the outside porch lights. They'll be back in a few weeks to finish up the rest of the lights/outlets.
On day 87 the Heat Guy was back, and he hooked up the mini split. They're running as I type, keeping the house warm for floor installation. The contractor finished flooring the bathroom, hall, bedroom, and closets. I can't wait to see the main living area all done...maybe by the end of the week? Fingers crossed.